Location
Located in No 602, Shiliugang, Zhuhai District, Guangzhou, it is convenient to reach there for on-site maintenance. 
Construction
Area:800 square meters
Anti-static floor
Earthquake-resistant design meets the demand at the 8 degrees
Load-bearing capability: 800kg per square meter
4.5-meter ceiling height

Power Guarantee
City Power Supply: Two-way city power supplies, 10KV
UPS:Redundant(1+1)intelligent UPS system and sufficient battery, 120-minute power supplies if with full charge
Generator Group :Backup diesel generator group
Power supply: 99.99%

Air-conditioner System
Dedicated air-conditioners for data center
Air-flow: down-flow
Temperature: 18–26℃
Humidity: 40%–70% 
Cable Allocation System
Power cable route: under the raised floor
Communication cable route: upper the racks
Separated communication and power cables
ODF, DDF, MDF layout racks are available
Fire Prevention System
Burning Block Design: Burning-block material is adopted for walls, cages, floors, etc
Early smoke detection system:High-sensitive automatic system is used for early fire alarm.
Fire extinguishing system: FM200
24×7staff patrol 
Network
20Gbps connected with China Netcom backbones
High-performance Cisco network equipment
Connecting layer:Connecting with carriers with independent Routers
Core layer:Backbones route gathering and data exchange to realize the high-speed transmitting
Gathering layer:Strategies carry out and application control
Access Layer:Multiple access ways and bandwidth control
Redundant route
Redundant chain
Redundant equipments
Redundant ports
Security System
7×24 live closed circuit TV monitoring
Biometric access control
24×7staff patrol
 |