Location
Located on 26 Beisen Road, Qingyang District, Chendu. It is convenient to get there for on-site maintenance. 
Construction
Area: 6000 square meters
Anti-static floor
Aseismatic intensity: at the 8 degrees of earthquakes
Load-bearing capability: 1000kg per square meter
4.5-meter ceiling height 
Power Guarantee
City Power Supply: Two-way city power supplies, capacity is 3000KVA
UPS:Redundant(1+1)intelligent UPS system and sufficient battery, 120-minute power supplies if with full charge
Generator Group: Backup diesel generator group
Power supply: 99.99% 
Air-conditioner System
Air-conditioner brand: Merlingerin and Hirros air-conditioners dedicated for data center
Air-flow: up-flow
Temperature: 18–26℃
Humidity: 30%–70% 
Cable Allocation System
Power cable route: under the raised floor
Communication cable route: upper the racks
Separated communication and power cables
ODF, DDF, MDF layout racks are available
Fire Prevention System
Burning Block Design: Burning-block material is adopted for walls, cages, floors, etc
Early smoke detection system: High-sensitive automatic system is used for early fire alarm.
Fire extinguishing system: FM200
24×7staff patrol 
Network
100Gbps connected with China Telecom backbones
Connecting layer: Connecting with carriers with independent Routers
Core layer:Backbones route gathering and data exchange to realize the high-speed transmitting
Gathering layer: Strategies carry out and application control
Access Layer: Multiple access ways and bandwidth control
Redundant route
Redundant chain
Redundant equipments
Redundant ports
Security System
7×24 live closed circuit TV monitoring
IC card and pin clock access controls
24×7staff patrol  |